• Heavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVA
  • Heavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVA
  • Heavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVA
  • Heavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVA
  • Heavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVA
  • Heavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVA

Heavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVA

Type: Self-Starting Diesel Generator
Installation Method: Fixed
Stroke: Four Stroke
Cooling Method: Water Cooling
Output Type: AC Three Phase
Speed: Speed
Samples:
US$ 160000/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2018

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
BS-MU1250
Conditions of Use
Land Use
Usage
Common Units, Standby Unit, Emergency Crew
Landuse Type of Unit
Low Noise
Excitation Mode
AC Rotating Exciter
Engine
Mtu
Alternator
Stamford
Controller
Smartgen, Deepsea...
Starting Method
Electric Start
Power
220kw - 1800kw
ATS
Optional
Color
as Per Request
Frequency
50Hz/60Hz
Voltage
400V 380V
Transport Package
Packed in Plywood Cases or Wooden Cases or Foam, E
Specification
As for power
Trademark
BOSSPOWER
Origin
China
HS Code
85021300
Production Capacity
100 Sets / Month

Product Description

PRODUCT DESCRIPTION  
Frequency: 50HZ;Rotating speed: 1500Rpm
Model Power(KW) Capacity(KVA) Rated current(A) Engine Model Stamford
BS-MU275 220 275 396.9 6R1600G10F HCI444D
BS-MU313 250 313 451.1 6R1600G20F HCI444ES
BS-MU375 300 375 541.3 8V1600G10F HCI444FS
BS-MU400 320 400 577.4 8V1600G20F HCI444F
BS-MU450 360 450 649.5 10V1600G10F HCI544C
BS-MU500 400 500 721.7 10V1600G20F HCI544C
BS-MU600 480 600 866.1 12V1600G10F HCI544E
BS-MU656 520 656 938.2 12V1600G20F HCI544F
BS-MU656 525 656 947.2 12V2000G25 HCI544F
BS-MU800 640 800 1154.7 12V2000G65 LVI634C
BS-MU913 730 913 1317.1 16V2000G25 LVI634D
BS-MU1000 800 1000 1443.4 16V2000G65 LVI634E
BS-MU1125 900 1125 1623.8 18V2000G65 LVI634F
BS-MU1250 1000 1250 1804.3 18V2000G26F LVI634G
BS-MU1375 1100 1375 1984.7 12V4000G23R PI734B
BS-MU1650 1320 1650 2381.6 12V4000G23 PI734D
BS-MU1813 1450 1813 2616.2 12V4000G63 PI734E
BS-MU2063 1650 2063 2977.0 16V4000G23 PI734F
BS-MU2250 1800 2250 3247.7 16V4000G63 PI734G
More specific parameters to choose.
 
PRODUCT SHOWS  

Heavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVA



 
PRODUCT ADVANTAGE  
 
(1)The silent canopy we use cold-rolled sheet, all positions are stronger.
 
(2)Our spraying plastics all go through pre-treatment of pickling and phosphating, so that the surface of the
    
    painting will not change color even if placed outside for five years.

 
(3)Canopy color painted by customer's requirement.
 
(4)Strict test including 50% load,75% load,100% load and 110% Load .
 
(5)Forklift mouth in base frame for easy loading and discharging.
 
(6)Logo made by customer's requirement if order quantity ≥10units or a full container.

Heavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVA
Heavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVAHeavy Duty Power 3 Phase Mtu Container Silent Diesel Generator 1250kVA
FAQ  
Q: Do you offer OEM service?
A: Yes
Q: What is your payment term?
A: 30% T/T in advance, the rest payment before shipment.  Or irrevocable L/C.
Q: What is your lead time?
A: About 30 days after receiving deposit or original L/C.But if your order with some special design, then the
    delivery time is longer.

Q: What certificates do you have?
A: We have CE, ISO. And we can apply for specific certificate for different country such as SONCAP for Nigeria,
     CIQ for Egypt, SASO for Saudi Arabia, etc

Q:What is your MOQ?
A: Above 1pc
Q. Which port do you often use when export?
A: Fuzhou Port, or as customer request.
Q.How to choose the power?
A.:Collect all power of your equipments,take the current into your consideration.
Q.What is the difference between Prime power and Standby power?
A.:Prime power is 12hours continous power,one hour 10% over load in every 12 running hours is allowed.
Standby power is the limit value of maximum output for emergency use. Overloading is prohibited
Q.What about the warranty
Guarantee for one year or 1000 hours (accord to whichever reach first) from ex-factory date.During the guarantee period,
our company will provide the free easy damaged spare part for problems caused by our quality of production or raw material
except the damageable spare parts of diesel engine caused by customer's incorrect man made operation.After expiration,
our company provides cost parts maintenance for gen-set.

 
CONTACT US   

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2018

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company
Registered Capital
65000000 RMB
Plant Area
1001~2000 square meters